Fire Damage Projects

REPAIRS & RESTORATION

Client

The Indian Hotels Co. Ltd.

Project

Restoration of Taj Mahal Palace Hotel after terrorist attack of 26/11

Location

Mumbai

Project Details

  • The Taj Mahal Palace is one of the landmark heritage structures of Mumbai, with a rich history.
  • The iconic hotel was subjected to the brutal terrorist attack on the 26/11/2008.
  • Structwel did entire heritage conservation and structural retrofitting of the structure damaged due to fire and bomb blast.

Client

Shree Shanmukhananda Fine Arts and Sangeetha Sabha

Project

Structural Retrofitting of the fire damaged auditorium

Location

Sion, Mumbai

Project Details

  • This International Conference Centre was constructed in 1956-58 with large entrance foyer, Auditorium in the middle and conference rooms of varying capacities at the back on a total area of around 20,000 sq. m.
  • This famous structure accidently caught fire in February 1990 consuming the first few clusters of seating and the asbestos roofing.
  • Structwel assumed the responsibility of the structural retrofitting of the auditorium to resurrect it back glory.

Client

Sun Vacuum Formers Ltd.

Project

Structural Audit / Non-destructive Testing / PMC during Repairs & Restoration

Location

Gurgaon, Delhi

Project Details

  • Sun Vacuum Formers Ltd., a manufacturer of plastic components for Automotive sector, has one of its manufacturing units at Gurgaon in an area occupying around 43530.20 sq. ft.
  • A major fire broke out in the unit in June 2015 charring the entire ground floor and the first floor of the factory, which were being used as raw material storage and go down.
  • The fire also gutted the main production hall having a total height of around 20 m.

Client

The Building Committee of Beaumonde Tower B Wing

Project

Structural Audit / Non-destructive Testing / Propose Repairs Methodology

Location

Worli, Mumbai

Project Details

  • Beaumonde tower is an iconic residential skyscraper comprising of 3 wings of 33 stories each.
  • A massive fire broke out in the tower on the 33rd floor of B wing in June 2018.
  • Structwel was appointed to conduct a Structural Audit to assess the damage, conduct the required Non-destructive tests and suggest repair methodology.