REPAIRS & RESTORATION

Client

City and Industrial Development Corporation of Maharashtra

Project

Structural Audit | Non-destructive Testing | Preparation of Cost Estimates

Location

Cidco Navi Mumbai

Project Details

  • CIDCO Bhavan is a G+7 storey structure which serves as a Headquarters to City and Industrial Development Corporation of Maharashtra and is in Belapur, Navi Mumbai.
  • It is a RCC structure and was constructed in around 1982-83. It occupies total of 2,25,000 sq. ft. area.
  • Structwel was appointed to conduct Structural Audit of the entire building with special emphasis on the externals of the building.

Client

Shailesh towers CHS

Project

Structural Audit | Non-destructive Testing | Audit Report, Estimate & Tender

Location

Nerul, Navi Mumbai

Project Details

  • This twin tower has two wings A & B. Each wing is a G+13 storey RCC framed structure. Each floor has 4 flats except for the 13th floor which has two duplex flats.
  • Structwel carried out the Structural Audit including Non-destructive testing and preparation of Cost Estimates along with Tendering.

Client

St. Jude India Child care center

Project

Structural Audit | Estimate | Site PMC during Execution

Location

Mumbai

Project Details

  • St. Jude India Child Care Centre provides a home away from home for children undergoing cancer treatment.
  • They have constructed G+4 Storey RCC framed buildings having total built-up area of around 1351 sq. ft. to accommodate these children while they receive treatment in cities away from their homes.
  • The structure is 49 years old and was not in use for some years.
  • Structwel was appointed to conduct Structural audit of the structure with a view to transform the old residential structure to suit the new requirements.

Client

ICICI Bank

Project

Condition Assessment for Terrace Waterproofing

Location

BKC, Mumbai

Project Details

  • This unique structure is a regional head office of ICICI Bank in BKC, Mumbai. It is a G+11 storey RCC structure constructed around 15 years ago.
  • The structure is divided in two blocks i.e., North Block and South Block.
  • Structwel was appointed to carry out Condition Assessment of Terrace areas to make them leak-proof above CMD’s office including lawns.

 

Client

Hill Park CHS

Project

Structural Audit | Proposal of repairs methodology | Estimate | PMC during Execution

Location

Malabar Hill, Mumbai

Project Details

  • Hill Park Properties situated at Malabar Hill, Mumbai, comprises of 5 RCC buildings of G+5 storeys. All these buildings were constructed in around 1948.
  • The compound has Garages placed along the compound wall on front and right side of the plot. It also has a gymnasium room in one corner of the plot.
  • Structwel carried out the Structural Audit of the buildings along with the Gymnasium, Badminton Court and the Garage Area.

Client

HDFC Bank Ltd.

Project

Consultancy for Waterproofing | PMC during execution | Certifying the work on completion

Location

Lower Parel, Mumbai

Project Details

  • This iconic building is a corporate office of HDFC, one of the leading private banks of India.
  • Structwel was appointed to carry out Condition Assessment of Terrace areas to make them leak-proof above MD’s office including lawns.

Client

Raheja Center

Project

Structural Audit | Non-destructive testing | Cost Estimate | Tendering

Location

Nariman Point, Mumbai

Project Details

  • Raheja Centre is a multi-storied commercial office complex at Nariman Point.
  • Repairs majorly comprised of Corrosion, Poor upkeep, Leakages & up-gradation of service ducts and service passages.

Client

Bombay Scottish School

Project

Estimate | Tender | PMC during Execution

Location

Mahim, Mumbai

Project Details

  • Bombay Scottish School (BSS), popularly known as Scottish, is a private, co-educational day school located at Mahim West in Mumbai, India.
  • Structwel was hired to prepare BOQ & Tender, finalization of the contractor and PMC during execution.

Client

Dhirubhai Ambani International School

Project

Structural Audit | Non-destructive Testing

Location

BKC, Mumbai

Project Details

  • This renowned international school building is a RCC framed structure with G+7 storeys. It was constructed in 2013.
  • The total area occupied by the structure is 1.30 L sq. ft.
  • The structure is “S” in shape having classrooms and other utilities required.
  • Gardens / lawns have been maintained over terraces above classrooms on west side of the structure on each floor starting from second floor.

Client

Sangli Miraj Kupwad Municipal Corporation (SMKC)

Project

Structural Audit | Estimation | Non-Destructive Testing

Location

Sangli, Maharashtra

Project Details

  • Total 26 Buildings with 52 wings and 1388 tenements were built under the Mass Housing Scheme at Sangli & Miraj as a part of Pradhan Mantri Awas Yojana.
  • The buildings were constructed in the time span of 6 years starting from 2012 till 2018.
  • SMKC appointed Structwel to conduct Structural Audit at pre-occupancy stage to confirm as built structures as specified.
  • The assignment was carried out along with various Non-destructive testing and design review on sample basis.

Client

Indian Institute of Technology Bombay

Project

Structural Audit | Non-destructive Testing

Location

Powai, Mumbai

Project Details

  • Indian Institute of Technology is a prestigious institute for technical education in India.
  • It also accommodated a convocation hall which is old auditorium building having RCC framed structure with RCC folded plate roof.
  • Structwel was appointed to conduct certain N.D. Tests and Structural analysis of the roof.