Industrial Projects

REPAIRS & RESTORATION

Client

Reliance Industries Ltd.

Project

Structural Audits / Estimate / Tendering / PMC during Execution

Location

Jamnagar, Gujarat

Project Details

  • RIL refinery at Jamnagar, Gujarat is one of the largest refineries in the world.
  • Structwel was involved in conducting a structural audit for various plants of the refinery which include plants like R.T.F, CPP, OSBL, Hydrogen Plant, Polypropylene, Hydrotrester, Coker plant, Aromatics, Sulphur Plant, PP plant, Crude I & II and FCCU including PRU.

Client

Bharat Petroleum corporation Ltd.

Project

Structural Audits / Estimate / Tendering / PMC during Execution

Location

Mahul, Mumbai

Project Details

  • BPCL has a huge petrochemical plant in Mumbai with numerous allied structures in the compound.
  • Structwel was involved in conducting structural audits of 3 pump houses, 1 FCCU stack, Pipe racks,                      55 residential structures and 39 allied structures. Structwel also conducted Non-destructive testing of FCCU Control Room etc.

Client

Coromandel International Limited

Project

Condition Health Assessment / Structural Design Review / Non-destructive Testing / Tendering

Location

Ennore, Chennai

Project Details

  • Coromandel International Ltd. is a Compound Fertiliser Factory in Chennai.
  • The Fertiliser Plant is a G+6 storey RCC structure and the approximate total area of the structure is 42,000 sq. ft.
  • Structwel was appointed to conduct Condition Health Assessment and structural design review of the Fertilizer Plant Complex at Ennore Plant site in Chennai.
  • The scope also included carrying out certain Non-destructive Testing & Tendering.

Client

ACC Limited

Project

Structural Audits / Estimate / Tendering / PMC during Execution

Location

Lakheri, Rajasthan

Project Details

  • ACC is a cement plant with total of 40 allied structures.
  • Structwel was engaged in conducting the structural audit of the entire plant which includes taller structures like pre-heater buildings, Silos & underground tunnels.
  • The assignment also included the audit of housing colony which accommodates total of 238 structures.

Client

Indian Farmers Fertiliser Cooperative Limited

Project

Structural Audits / Estimate / Tendering / PMC during Execution

Location

Paradeep, Odisha

Project Details

  • This fertilizers plant has RCC & Steel structures and is situated in Paradeep in Odisha.
  • The plant houses total of 331 structures which include warehouses, plant building, storage tanks, chimneys & conveyors.
  • Structwel was involved in conducting a structural audit; thereby, identifying distresses, proposing the required repairs, estimating the repairs cost and tendering.

Client

Tata Power Ltd

Project

Condition Assessment / Estimate / Tendering / PMC during Execution

Location

Trombay, Mumbai

Project Details

  • Tata Power is a Thermal Power plant having units from 1 to 8 situated at Trombay, Mumbai.
  • Structwel’s services were engaged for carrying out Condition Assessment of RCC & Steel structures including Chimneys, Turbo Generator, Foundations, Plant Buildings, Steel structures hoisting conveyors with total length of around 4 km.
  • The assignment was carried out on recurring basis for the time span from 1995 to 2014.

Client

Maharashtra State Electricity Transmission Company

Project

Condition Assessment / Non-destructive Testing / Remedial Measures

Location

Humbarli, Maharashtra

Project Details

  • The Koyna Hydroelectric Project is the largest completed hydroelectric power plant in India. It is a complex project with four dams including the largest dam on the Koyna River, Maharashtra.
  • Structwel was hired to carry out Condition Assessment of Dam Foot Powerhouse, Turbo Generator Foundation, Draft Tube Gate Structure, Intake Gate Structure near Penstock & Tail Race Tunnel.
  • The assignment also included Non-destructive Testing & Proposal of Remedial Measures with block budgetary cost.