Project Description

Mass Housing Sangli

Signature Project – Category Repairs & Restoration : Building

Project Details

  • Total 26 Buildings with 52 wings and 1388 tenements were built under the Mass Housing Scheme at Sangli & Miraj as a part of Pradhan Mantri Awas Yojana.
  • The buildings were constructed in the time span of 6 years starting from 2012 till 2018.
  • SMKC appointed Structwel to conduct Structural Audit at pre-occupancy stage to confirm as built structures as specified.
  • The assignment was carried out along with various Non-destructive testing and design review on sample basis.