Project Description
Mass Housing Sangli
Signature Project – Category Repairs & Restoration : Building


Project Details
- Total 26 Buildings with 52 wings and 1388 tenements were built under the Mass Housing Scheme at Sangli & Miraj as a part of Pradhan Mantri Awas Yojana.
- The buildings were constructed in the time span of 6 years starting from 2012 till 2018.
- SMKC appointed Structwel to conduct Structural Audit at pre-occupancy stage to confirm as built structures as specified.
- The assignment was carried out along with various Non-destructive testing and design review on sample basis.